Introduction
Tunnel segments are assembled directly behind the TBM to form the tunnel's permanent load-bearing ring. A tunnel ring usually consists of 5 to 8 segments and a key segment.
Why Is ±0.3 mm Accuracy Essential?
Flawless Gasket Grooves: The EPDM gaskets between segments are designed to withstand water pressures of 8 bar and above. Even a 1 mm error in mould geometry can fold the gasket or prevent full contact, leading to groundwater ingress.
Distribution of TBM Thrust: As the TBM advances, its thrust cylinders push against the segment ring (3,000 to 6,000 tonnes of total force). If the surfaces are not parallel, the force concentrates at a single point and causes spalling at the concrete edges.
Surface Finish: In ARM moulds, contact surfaces are machined in a single setup on 5-axis gantry CNC machining centres. Steel plate thicknesses are optimised against vibration and thermal expansion.